A complete listing of Capital Improvement Projects.

Project Name Limit From Limit To Keymap Internet Notes
Aldine Westfield Rd E Louetta Rd Riley Fuzzell Rd 292L 292R 292Q Planned improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropraite drainage system, and all appurtenances necessary for realizing a completed project. Project is currently in the Study phase. (Last Updated On 8/19/2014)
Cypress N Houston Rd Jones Rd FM 1960 369K 369Q 369R Proposed improvements include widening and extending Cypress North Houston Road [Lou Edd Road] as a 4-lane concrete boulevard section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is in the Study phase. (Last Updated On 8/19/2014)
Fagan Ln Cedar Ln Telge Rd 287Y Proposed improvements include the installation of a two lane roadway between Cedar Lane and Telge Road. Project is in the Design phase. (Last Updated On 8/19/2014)
Gosling Rd Mossy Oaks Rd W Rayford Rd 290H 290D 250Z 250V Proposed improvements include widening Gosling Road as a 4-lane concrete boulevard section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is in the Study phase. (Last Updated On 8/19/2014)
Gosling Rd Spring Stuebner Rd W Mossy Oaks Rd 290M Improvements include widening Gosling Road to a 5-lane concrete pavement with appropriate drainage system within a 100-foot right of way including an at-grade railroad crossing at the UPRR. Project is currently in the Design Phase and it is Precinct 4's goal to seek bid authorization in the first quarter of 2015. (Last Updated On 8/19/2014)
Grand Pkwy - F1 and F2 US 290 IH 45 445T Proposed 4-lane divided roadway also known as SH 99. SH 99 falls under the jurisdiction of the Texas Department of Transportation (TxDOT) and the Design/Build contractor is Zachry-Odebrecht Parkway Builders (ZOPB). For more information contact TxDOT at (713) 802-5000, visit ZOPB's website at www.GrandParkway99.com, or contact Linda Merritt, ZOPB Public Information, at (832) 232-7316. (Last Updated On 8/19/2014)
Grant Rd Old Kluge Rd Spring Cypress Rd 328T Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, traffic signalization or signal modifications as warranted and all appurtenances necessary for realizing a completed project within an 80-foot right of way. Project is currently in the Study Phase. (Last Updated On 8/19/2014)
Holzwarth Rd - North 675 north of Emerson Ridg Spring Stuebner Rd 292N Proposed improvements include installation of a 4-lane concrete boulevard section within a 100-foot right of way including low impact development components and a storm sewer system. Notice to Proceed was given June 23, 2014. Project completion is scheduled for October 2014 [barring unforeseen circumstances beyond the Contractor's control, i.e, excessive inclement weather during the course of the contract.] (Last Updated On 8/19/2014)
Hufsmith Kohrville-6 Rd Willow Creek Estates Ln FM 2920 289E Planned improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system or 5-lane concrete pavement with open ditch drainage accommodating low impact components addressing water quality needs, traffic signals or traffic signal modifications as warranted and all appurtenances necessary for realizing a complete project. Project is in the Study phase. (Last Updated On 8/19/2014)
Hufsmith-Kohrville at Holderrieth 289T The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Hufsmith-Kohrville at Holderrieth Road. Planned improvements include installation of a northbound to westbound and eastbound to northbound left turn lane. This is a Joint Participation project between Harris County and the Tomball Economic Development Corporation. The Project is currently in the final design phase. (Last Updated On 8/19/2014)
Hufsmith-Kohrville Rd 400 S of Spring Cypress Rd Hollow Glen Ln 329F Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, traffic signalization or signal modifications as warranted and all appurtenances necessary for realizing a completed project. The Project was awarded to Menade, Inc. in July 2014. The clearing activity is nearing completion and the respective utility reloaction efforts are underway. Roadway construction is expected to commence in the 4th quarther of 2014. (Last Updated On 8/19/2014)
Kuykendahl Rd Indian Hills Rd South of Spring Creek 250J Planned improvements include widening Kuykendahl Road to a 4-lane roadway with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is in the Design phase. (Last Updated On 8/19/2014)
Kuykendahl Rd at Spring Creek Bridge 250E Project includes the installation of an additional 2-lane bridge over Spring Creek. Project is in the Design phase. (Last Updated On 8/19/2014)
Louetta North Rd Blanco Trails Ln Telge Rd 328S Proposed improvements include extending Louetta Road as a 4-lane concrete pavement section, with appropriate drainage accommodations, traffic signalization, and all appurtenances necessary for realizing a complete project. Project is currently in the Study phase. (Last Updated On 8/19/2014)
Louetta Rd Imperial Woods Ln Cypress Ridge Dr 328X Proposed improvements include widening Louetta Road to a 4-lane concrete boulevard section including a traffic signal system on Louetta Road at Longwood Trace Drive. Notice to Proceed was given May 2014 and Project completion is expected September 2014 [barring unforeseen circumstances beyond the Contractor's control, i.e, excessive inclement weather during the course of the contract.] (Last Updated On 8/19/2014)
Riley Fuzzel Rd Aldine Westfield Rd Hardy Toll Rd 292M Planned improvements include upgrading the existing 2-lane asphalt roadway to a 5-lane concrete pavement section with appropriate drainage system, and all appurtenances necessary for realizing a complete project. The Project is currently in the Design phase. (Last Updated On 8/19/2014)
Spring Cypress Rd IH 45 Lexington/Wunsche Loop Blvd 292P Planned improvements include upgrading Spring Cypress Road from a 4-lane asphalt roadway to a 5-lane concrete pavement within a 100-foot right of way including appropriate drainage accommodations. The Project is currently in the Bid and Award phase. (Last Updated On 8/19/2014)
Spring Stuebner Rd - C Falvel Rd I45 291Q Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete pavement with 14-foot wide medians, drainage mitigation, traffic signals or traffic signal modifications. The Project was awarded to SER and a Notice to Proceed date was given January 2014. Completion of the roadway project is scheduled for December 2014 [barring unforeseen circumstances beyond the Contractor's control, i.e, excessive inclement weather during the course of the contract.] (Last Updated On 8/19/2014)
T C Jester Blvd FM 1960 FM 2920 331T The necessary traffic engineering investigations have been accomplished to warrant the installation of ten traffic signal systems on T. C. Jester Boulevard between FM 1960 and FM 2920. Intersections to be signalized include T. C. Jester at 1) Chapel Bend Drive 2) Aspen Bend Drive 3) Kennonview Drive 4) Glenmere Lane 5) Winding Ridge Drive 6) Center Court Drive 7) Pinelakes Boulevard 8) Alvin A. Klein Drive 9) Springbrook Hollow Drive, and 10) Spring Creek Oaks Drive. Project is in the construction phase. (Last Updated On 8/19/2014)
Timber Forest Dr at Flax Bourton St 337W The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Timber Forest Drive at Flax Bourton Drive. Project is scheduled for completion August 2014 [barring unforeseen circumstances beyond the Contractor's control, i.e, excessive inclement weather during the course of the contract.] (Last Updated On 8/19/2014)
Treaschwig Segment A Rd Aldine Westfield Rd Birnam Wood Blvd 334A Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is currently in the Study phase. (Last Updated On 8/19/2014)
Treaschwig Segment B Rd Birnam Wood Blvd Cypresswood Dr 333H 333D 334A Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is currently in the Study phase. (Last Updated On 8/19/2014)
Wilson Rd at Canyon Village Trace Dr 376S The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Wilson Road at Canyon Village Trace Drive including southbound left turn lane on Wilson Road. Project is scheduled for completetion August 2014 [barring unforeseen circumstances beyond the Contractor's control, i.e, excessive inclement weather during the course of the contract.] (Last Updated On 8/19/2014)