A complete listing of Capital Improvement Projects.

Project Name Limit From Limit To Keymap Internet Notes
Aldine Westfield Rd E Louetta Rd Riley Fuzzell Rd 292L 292R 292Q Planned improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropraite drainage system, and all appurtenances necessary for realizing a completed project. The Project is currently in the Design phase and is expected to be published for bidding purposes in the third quarter of 2015. (Last Updated On 11/18/2014)
Cypress N Houston Rd Jones Rd FM 1960 369K 369Q 369R Proposed improvements include widening and extending Cypress North Houston Road [Lou Edd Road] as a 4-lane concrete boulevard section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is in the Study phase. (Last Updated On 11/18/2014)
Fagan Ln Cedar Ln Telge Rd 287Y Proposed improvements include the installation of a two lane roadway between Cedar Lane and Telge Road. The Project is currently in the Design phase. (Last Updated On 11/18/2014)
Gosling Rd Spring Stuebner Rd W Mossy Oaks Rd 290M Improvements include widening Gosling Road to a 5-lane concrete pavement with appropriate drainage system within a 100-foot right of way including an at-grade railroad crossing at the UPRR. Project is currently in the Design Phase and it is Precinct 4's goal to seek bid authorization in the first quarter of 2015. (Last Updated On 11/18/2014)
Gosling Rd 350' N Of Mossy Oaks Rd 350' S Of West Rayford Rd 290H 290D 250Z 250V Proposed improvements include widening Gosling Road as a 4-lane concrete boulevard section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is in the Study phase. (Last Updated On 11/18/2014)
Gosling Rd 350' S Of West Rayford Rd 350' N Of Creekside Forest Dr 250R Proposed improvement includes the upgrade to a 4-lane concrete pavement section with appropriate drainage system. Project is currently in the Study phase. (Last Updated On 11/18/2014)
Gosling Rd Bridge 350' N Of Creekside Forest Dr 600' N Of north approach slab of 250R Proposed improvements include installing a dual bridge on Gosling Road over Spring Creek. Project is currently in the Study phase. (Last Updated On 11/18/2014)
Grand Pkwy - F1 and F2 US 290 IH 45 445T Proposed 4-lane divided roadway also known as SH 99. SH 99 falls under the jurisdiction of the Texas Department of Transportation (TxDOT) and the Design/Build contractor is Zachry-Odebrecht Parkway Builders (ZOPB). For more information contact TxDOT at (713) 802-5000, visit ZOPB's website at www.GrandParkway99.com, or contact Linda Merritt, ZOPB Public Information, at (832) 232-7316. (Last Updated On 11/18/2014)
Grant Rd Old Kluge Rd Spring Cypress Rd 328T Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, traffic signalization or signal modifications as warranted and all appurtenances necessary for realizing a completed project within an 80-foot right of way. Project is currently in the Design Phase and it is Precinct 4's goal to seek bid authorization in the third quarter of 2015. (Last Updated On 11/18/2014)
Huffmeister Rd SH 6 West Rd 408B 408F Proposed improvements include the design of a 4-lane concrete boulevard section with appropriate drainage system. The Project is currently in the Study phase. (Last Updated On 11/18/2014)
Hufsmith Kohrville-6 Rd Willow Creek Estates Ln FM 2920 289E Planned improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system or 5-lane concrete pavement with open ditch drainage accommodating low impact components addressing water quality needs, traffic signals or traffic signal modifications as warranted and all appurtenances necessary for realizing a complete project. Project is in the Study phase. (Last Updated On 11/18/2014)
Hufsmith-Kohrville at Holderrieth 289T The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Hufsmith-Kohrville at Holderrieth Road. Planned improvements include installation of a traffic signal system including a northbound to westbound and eastbound to northbound left turn lane. This is a Joint Participation project between Harris County and the Tomball Economic Development Corporation. The Project is currently in the final design phase and is expected to be published for bidding purposes the 4th Quarter of 2014. (Last Updated On 11/18/2014)
Hufsmith-Kohrville Rd 400 S of Spring Cypress Rd Hollow Glen Ln 329F Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, traffic signal modifications as warranted and all appurtenances necessary for realizing a completed project. The clearing activity is complete and roadway construction can commence upon completion of the utility reloaction efforts by AT&T. (Last Updated On 11/18/2014)
Hufsmith-Kohrville Rd 500' N Holderrieth Rd 500' S Willow Creek Estates Ln 289T 289P 289N 289J Proposed improvements include upgrading Hufsmith-Kohrville Road as a 4-lane concrete pavement section with appropriate drainage system, traffic signals or traffic signal modifications as warranted and all appurtenances necessary for realizing a complete project. The project is currently in the Study phase. (Last Updated On 11/18/2014)
Hufsmith-Kohrville Rd 500' N Of Ezekiel Rd N Of Holderrieth Rd 329A 289W 289T Proposed improvements include upgrading Hufsmith-Kohrville Road as a 4-lane concrete pavement section with appropriate drainage system, traffic signals or traffic signal modifications as warranted and all appurtenances necessary for realizing a complete project. The project is currently in the Study phase. (Last Updated On 11/18/2014)
Hufsmith-Kohrville Rd Hollow Glen Ln 500' N Of Ezekiel Rd 329F 329B Proposed improvements include upgrading Hufsmith-Kohrville Road as a 4-lane concrete pavement section with appropriate drainage system, traffic signals or traffic signal modifications as warranted and all appurtenances necessary for realizing a complete project. The project is currently in the Study phase. (Last Updated On 11/18/2014)
Kuykendahl Segment D1 Rd Indian Hills Rd Timarron Dr 250J Planned improvements include widening Kuykendahl Road to a 4-lane roadway with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is currently in the Design Phase and it is Precinct 4's goal to seek bid authorization in 2015. (Last Updated On 11/18/2014)
Kuykendahl Segment D2 Rd Pine Plains Dr Flintridge Dr 250E Project includes the installation of an additional 2-lane bridge over Spring Creek. Project is in the Design phase. (Last Updated On 11/18/2014)
Louetta North Rd Blanco Trails Ln Telge Rd 328S Proposed improvements include extending Louetta Road as a 4-lane concrete pavement section, with appropriate drainage accommodations, traffic signalization, and all appurtenances necessary for realizing a complete project. Project is currently in the Design Phase and it is Precinct 4's goal to seek bid authorization in the third quarter of 2015. (Last Updated On 11/18/2014)
North Eldridge Pkwy Spring Cypress Rd Gregson Rd 328R 328M Proposed improvements include widening North Eldridge Parkway as a 4-lane concrete pavement section with appropriate drainage system. The Project is currently in the Study phase. (Last Updated On 11/18/2014)
Riley Fuzzel Rd 600' W Of Hardy Toll Rd 1375' W Of West Hardy Rd 292M Planned improvements include upgrading the existing 2-lane asphalt roadway to a 5-lane concrete pavement section with appropriate drainage system, and all appurtenances necessary for realizing a complete project. The Project is currently in the Study phase. (Last Updated On 11/18/2014)
Spring Cypress Rd IH 45 Lexington/Wunsche Loop Blvd 292P Planned improvements include upgrading Spring Cypress Road from a 4-lane asphalt roadway to a 5-lane concrete pavement within a 100-foot right of way including appropriate drainage accommodations. Roadway construction is expected to commence in the 4th quarter of 2014. (Last Updated On 11/18/2014)
Spring Stuebner Rd - C Falvel Rd I45 291Q Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete pavement with 14-foot wide medians, drainage mitigation, traffic signals or traffic signal modifications. The Project was awarded to SER and a Notice to Proceed date was given January 2014. Completion of the roadway project is scheduled for December 31, 2014 [barring unforeseen circumstances beyond the Contractor's control, i.e, excessive inclement weather during the course of the contract.]. (Last Updated On 11/18/2014)
T C Jester Blvd FM 1960 FM 2920 331T The necessary traffic engineering investigations have been accomplished to warrant the installation of ten traffic signal systems on T. C. Jester Boulevard between FM 1960 and FM 2920. Intersections to be signalized include T. C. Jester at 1) Chapel Bend Drive 2) Aspen Bend Drive 3) Kennonview Drive 4) Glenmere Lane 5) Winding Ridge Drive 6) Center Court Drive 7) Pinelakes Boulevard 8) Alvin A. Klein Drive 9) Springbrook Hollow Drive, and 10) Spring Creek Oaks Drive. Project is in the construction phase and is expected to be complete May 2015. (Last Updated On 11/18/2014)
Treaschwig Segment A Rd Aldine Westfield Rd Birnam Wood Blvd 334A Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is currently in the Study phase. (Last Updated On 11/18/2014)
Treaschwig Segment B Rd Birnam Wood Blvd Cypresswood Dr 333H 333D 334A Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is currently in the Study phase. (Last Updated On 11/18/2014)